Step 1: Construction Staging Areas & Storage Yards
In order to construct a pipeline, staging areas and storage yards are cleared, strategically located along the planned right-of-way. These areas are used to stockpile pipe and to store fuel tanks, sand bags, silt fencing, stakes, and equipment parts. They provide parking for construction equipment, employee trucks, and locations for office trailers.
Staging areas are cleared and covered in rough stone gravel, often reinforced with large wood timber matting. These areas can be located in fields, pasture, or forested land and can impact streams and wetlands. Often, these areas require the construction of access roads to and from paved roads, and to and from the areas to the pipeline ROW.
Step 2: Clear Cutting the ROW
After the equipment is accessible in the staging area, work will begin to clear cut the pipeline right-of-way. Landowners have the option of selling the timber themselves, or allowing the company responsibility for its sale or disposal. Large trees are stockpiled or hauled off, while the branches and tree tops are placed into piles and burned. A stump grinder then removes the remaining tree stumps in the ROW.